Trial Run of Delta PLC


Before Starting the Trial Run of Delta PLC anyone should check following things



Power Indication of Delta PLC

1. At the front of the MPU or the expansion unit, there is a �POWER� LED. When the MPU is powered ON, the LED (in green) will be ON. If the indicator is not on when the MPU is powered up, it means there is problem that DC power supplies to PLC. Thus, it is important to check whether the wiring of +24V and 0V are properly conducted. If ERROR LED is blinking swiftly, it means +24VDC does not supply enough power to delta PLC.

2. If the other indicator, �L. V�, that locates at the front of the extension unit is on, it means that the input power voltage to the extension unit is insufficient, and the output from the extension unit should be prohibited.

Preparation

1. Make sure that the power wiring and the I/O wiring are both conducted properly before the power ON. Please ensure NOT supply AC110V or AC220V to the I/O terminals, or the wiring might be short circuit which would damage the PLC directly.

2. After using the peripheral devices to write the program into the MPU and that the ERROR LED of the MPU is not on, it means that the program in use is legitimate, and it is now waiting for the user to give the RUN command.

3. Use HPP to execute the forced On/Off test of the output contact.

Operation & Testing DVP14SS Delta PLC:


1. If the ERROR LED of the MPU is not blinking, use the peripheral device to give the RUN command, and the RUN indicator will then be on.

2. HPP could be utilized to monitor the settings and the registered values of the timer, the counter and the data register during operation. Also it is used to force the I/O contacts to conduct the On/Off motion. If the ERROR LED is on (but not blinking), it means that the setting of the user�s program has exceeded the preset time-out limit. At this case, please turn the PLC RUN/STOP switch to STOP, and find out the address of the time-out program by special data register D1008. �WDT� instruction can be used to solve the problem.

The PLC I/O Response Time:


The total response time of the PLC from the input signal to the output motion is calculated as follows:

�Response Time� = �input interface delay time� + �user�s program scan time� + �output motion delay time�

Update Contact :
No Wa/Telepon (puat) : 085267792168
No Wa/Telepon (fajar) : 085369237896
Email : Fajarudinsidik@gmail.com
NB :: Bila Sobat tertarik Ingin membuat software, membeli software, membeli source code, membeli hardware elektronika untuk kepentingan Perusahaan maupun Tugas Akhir (TA/SKRIPSI), Insyaallah Saya siap membantu, untuk Respon Cepat dapat menghubungi kami, melalui :

No Wa/Telepon (puat) : 085267792168
No Wa/Telepon (fajar) : 085369237896
Email: Fajarudinsidik@gmail.com


atau Kirimkan Private messanger melalui email dengan klik tombol order dibawah ini :

ٱلْحَمْدُ لِلَّهِ رَبِّ ٱلْعَٰلَمِين
Alhamdulilah hirobil alamin

وَ السَّلاَمُ عَلَيْكُمْ وَرَحْمَةُ اللهِ وَبَرَكَاتُهُ
wassalamualaikum warahmatullahi wabarakatuh


Artikel Trial Run of Delta PLC, Diterbitkan oleh scodeaplikasi pada Rabu, 21 Desember 2011. Semoga artikel ini dapat menambah wawasan Anda. Website ini dipost dari beberapa sumber, bisa cek disini sumber, Sobat diperbolehkan mengcopy paste / menyebar luaskan artikel ini, karena segala yang dipost di public adalah milik public. Bila Sobat tertarik Ingin membuat software, membeli software, membeli source code ,Dengan Cara menghubungi saya Ke Email: Fajarudinsidik@gmail.com, atau No Hp/WA : (fajar) : 085369237896, (puat) : 085267792168.

Tawk.to